masterplan

Osterley Cricket Club Redevelopment

Following a devastating fire in 2022, which destroyed most their clubhouse, Osterley Cricket Club appointed gcp to prepare a detailed feasibility study for the redevelopment of their ground just off Tentelow Lane in Southall. The ground is set within the historic and listed landscape around Osterley House. The site is busy throughout the year and is also the home of Cademy FC, a vibrant and successful youth football club with links to many premier league football teams. The feasibility study quickly highlighted that in order to deliver the club’s vision for the site, a comprehensive masterplan was required to allow for a phased redevelopment as funding becomes available.   

 

The preliminary planning stage masterplan design includes a remodelled site with parking improvements and ecological enhancements to support biodiversity, a new clubhouse incorporating the remainder of the fire-damaged changing block, a secondary officials’ block with sensory space, and 3 new practice batting lanes. The planning design is a result of extensive collaboration between the club, the England & Wales Cricket Board and numerous stakeholders including Ealing Borough Council, Sport England, Middlesex Cricket, Middlesex FA, The Football Foundation and specialist subconsultants.

 

The final stage of the planning stage design development is a half day public consultation event at the club on Wednesday 10th July between 12 noon and 7pm. Following feedback received from the consultation designs will be revised and developed for planning submission by September 2024.

The Willows, Corbet Close

Over the past few years, we have been working with Curo on 2 projects in Lawrence Weston, helping them develop 185 new homes over the next few years. Century Park, Henacre will provide 128 new homes of which 30% will be affordable and The Willows will provide 57, 100% affordable homes.


We are thrilled that planning for the Willows, originally known as Corbet Close, was granted last month (July) after a long planning process.


The development, split over three connected parcels of land, contains a mix of houses and apartments and includes unused office space which will be converted to residential use. The Willows brings a unique identity with the use of coloured panels around entrances and bay windows. The office building, which sits in the middle, is to be reclad to visually tie the new accommodation together. 


The Willows, Corbet Close - Entrance

The Willows, Corbet Close - Entrance

Esther has worked on the project for 18 months. Here is what she says about her time on the project and the issues the team faced.



Most architecture practices will understand there is always one project in the office that has been running for years, with changes in size and brief, with almost every member of staff having worked on it at some point. This was one of those schemes, but in 2017, a brief was finalised when Curo agreed the purchase of the 3rd parcel of land, finally defining the size of the project.  



This was one of the first schemes I started on when I joined gcp and, although there have been some ups and downs, I have loved seeing the project through, and so pleased to have finally received planning. I had never quite understood the complexity a project like this brings and the time it would take from submitting a design to getting an approval 11 months later. 



I believe there were two main constraints that defined the scheme. Firstly, we needed to ensure the development was unified, using similar materials and detailing to give a connected character across the three sites. The other main constraint was to  integrate the surrounding public realm and existing footpath through the site into a development that aimed to produce a high-density of new homes on a restricted site. The site is bounded on one side by a busy main road and on the other by a narrow street; Corbet Close, which is a main route to the local primary school. The local neighbourhood planning group, Ambition Lawrence Weston, also stressed their desire for houses in preference to apartments.  This gave us a lot to consider and some conflicting requirements to resolve in a constrained site.

 

Through innovative design, we achieved a mix of accommodation with houses and maisonettes on one parcel, refurbished apartments in the old office building, and apartments and maisonettes on the final parcel of land. We widened the existing narrow public footpath that runs through the centre of the site to form a landscaped ‘pedestrian street’ creating a safer, more attractive route for pedestrians. We are really happy with the finished design which creates an exciting new pedestrian route and uses colour and materials to unify the three sites whilst maintaining their separate characters.

 

As with most of our projects, working with the local community is an important part of the planning process. gcp supported a number of consultations with local community and the neighbourhood planning group, endeavouring to respond to the concerns that people have when new development is proposed. Whilst there were concerns over highways issues and traffic generation, the community was also strongly in favour of more affordable homes, particularly as the scheme will include a number of shared-ownership homes that offer affordable routes to home ownership.

The Willows, Corbet Close - Road View

The Willows, Corbet Close - Road View

 

Colin, a director at gcp, was lead on both this project and Century Park.

 

It was good to work with Curo on these projects – they are one of our most long-standing clients and their aspiration for these sites is to deliver high quality designs that make a positive contribution to the local area. Having a client with high expectations of the design team is a great starting point and makes our job more satisfying.

 

My favourite part of the Willows will be the new pedestrian street.  The first time I walked through the existing path, I thought what it would have been like if my children had to use this route to get to school. It felt narrow, enclosed and on a dull day would be dark and uninviting. The new street we have developed will be wider, more open and overlooked and will incorporate landscape, public art and places to sit and chat.  I think this will be a lovely space and provide a connection where both the new and existing community can meet.  

The Willows, Corbet Close - Maisonettes

The Willows, Corbet Close - Maisonettes

Avon Valley Adventure and Wildlife Park gets a little cooler

MegaFan in play barn at Avon Valley Wildlife & Adventure Park

MegaFan in play barn at Avon Valley Wildlife & Adventure Park

Having been appointed to develop a masterplan for the long-term development of Avon Valley Country Park, park owner has sought gcp advice on other operational issues such as the overheating of the main play barn in summer due to sun heating up the roof and lots of children running about.

gcp suggested a range of low cost interventions including the installation of a slow moving destratification fan to help circulate air within the barn. Having taken this advice Avon Valley are currently trialling a destratification fan from Megafan Technologies Ltd and are experiencing promising results: cooler environment, fresher air and happier parents! In winter, the fan also works to push warm air down to ground level thereby reducing heating bills. It looks like with gcp’s practical advice this relatively simple intervention will a win in the summer and a win in the winter for Avon Valley. See the video on how this technology works.